In addition to the steel structure of the bicycle bridge, our facility manufactured the movable gate structure, which is the only liftable track over the X. flushing channel. The varying wall thicknesses and the calibrations of the joints were performed using the Skoda FCW 150 drilling-milling machine. To ensure the safe transportation of the bridge elements, our preparatory engineers designed a special transport frame so that the steel structure could arrive at the installation site from Sárospatak without any damage.