Client: Meleghy Automotive Hungary Kft.
Location: Miskolc
Function: Automotive parts manufacturing hall
Built up area: 10.209 m2
Construction period: 2023.11 – 2025. 03.
The renewable energy-powered facility was built on a 33,000 m² site, with 6,000 m² of built-up area and an additional 956 m² of outdoor space. The building consists of two main sections: a production hall and an office building. The modern design of the office building features extensive glass surfaces and a unified framework that plays a key role both aesthetically and functionally.
We have constructed a 24-meter-span production area within the hall, which includes not only manufacturing operations but also inbound and outbound warehouses, covered loading areas, parking spaces, and internal roadways. To support the production equipment, we installed a compressed air system and a cooling water network, as well as a 3.2-ton capacity crane.