Design and Build
Client: Aeroplex Central European Aircraft Maintenance Centre Ltd.
Location: Budapest, Airport
Function: Aircraft maintenance hangar
Area: 8,118 m²
Construction period: November 2020 – February 2022
We are very proud of the ACE hangar constructed at Budapest Airport, which we built as the aircraft hangar for Aeroplex Central European Ltd. as the general contractor. The steel structure was manufactured at our facility in Sárospatak. This is the largest hall we have built to date. The building had to be constructed between two existing hangars, with a working gap of only 70 centimeters and a span of 96 meters. This project earned us both the Construction Master Award and the Construction Excellence Award.
Technical specifications:
Footprint: 93.7 m x 87.9 m Height: 31.2 m
The roof’s truss frames, composed of pipe structures, have a cross-section of 5.8 m x 6.4 m and span 80 meters internally.